mercury Workshop Repair Guides

Mercury Workshop Service and Repair Manuals

All Technical Service Bulletins for EGR Valve:|86222 > < Engine - Stalls At Idle|Page 3569
Page 3
background image

7.

Place second EGR gasket over carbon trap and install EGR valve and retaining nuts. Torque retaining nuts to 12-18 ft.lbs. (16-24 N-m).
Reconnect vacuum hose and electrical connectors.

8.

Remove EGR water inlet connector from intake manifold and install pipe plug (87838-S101 with sealant. Torque to 12-21 ft.lbs. (16-28
N-m). Install vacuum cap (C9AZ-9C492-A) on three-way tee and secure with a new clamp (C9AZ-8287-A).

9.

Start engine and check for coolant, exhaust or vacuum leaks.

10.

Test drive vehicle.

NOTE:

If detonation (ping) is present, retard ignition timing in 2~ increments until detonation is gone. Do NOT exceed a maximum of 6~
below required specification. Obtain Ford Authorized Modifications Decal if timing is changed.

Obtain an Authorized Modifications Decal and list the date, dealer number, and summary of alterations performed. Select a prominent place
adjacent to the Vehicle Emission Control Information Decal suitable for installing the Authorized Modifications Decal. Clean the area, install the
decal, and cover it with a clear plastic decal shield.

PART NUMBER

PART NAME

CLASS

E5DZ-9D476-A

EGR Gasket

B

E7PZ-9F464-A

Carbon Trap - Cast Iron

C

Intake Manifold

E7PZ-9F464-B

Carbon Trap - Aluminum

C

Intake Manifold

87838-S101

Pipe Plug

BR

C9AZ-9C492-A

Vacuum Cap

A

C9AZ-8287-A

Clamp

AG

OTHER APPLICABLE ARTICLES: 86-2-22
WARRANTY STATUS: Reimbursable within the provisions of the Warranty and Policy Manual
OPERATION: SP870115A
TIME:

1.5 Hr. DLR. CODING: Basic Part No. 9F483 - Code: N9

All Technical Service Bulletins for EGR Valve:|86222 > < Engine - Stalls At Idle|Page 3569