mercury Workshop Repair Guides

Mercury Workshop Service and Repair Manuals

Variable Valve Timing > < Timing Cover|Service and Repair|Page 2900
Page 3
background image

4. NOTE:  Tighten the bolts and studs in the indicated sequence.

Install the remaining bolts and studs.

5. NOTE:  Lightly lubricate the new O-ring seals with engine oil before installation.

Install the CMP and CKP sensors.

6. Connect the CMP sensor and left hand HO2S electrical connectors.

-

Position the wiring harness and attach the retainer.

7. Connect the CKP sensor electrical connector and attach the retainer.
8. Install the power steering pump. 
9. Install the generator. 

10. Install the oil pan. 
11. Install the right-hand valve cover. 
12. Install the left-hand valve cover. 

Variable Valve Timing > < Timing Cover|Service and Repair|Page 2900