Grand Marquis V8-281 4.6L SOHC (1992)
5. Remove the test lead from terminal 3 and connect it to terminal 2 (hot feed pin). With all switches in the NEUTRAL position, only terminal 1
should have continuity to terminal 2.
6. Push all four switches forward and hold in that position. Terminals 5, 7, 9 and 11 should have continuity to terminal 2.
7. Pull all four switches rearward and hold in that position. Terminals 4, 6, 8 and 10 should have continuity to terminal 2.
8. Push the lock out switch to its detent position. Terminal 2 should not have continuity with any other terminal.
9. If any switch does not test as stated, replace the complete switch assembly.