mercury Workshop Repair Guides

Mercury Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 7293 > < Initial Inspection and Diagnostic Overview|Page 7291
Page 18
background image

G2

Normal Operation

The battery saver provides voltage to circuit 1005 (VT/OG). Circuit 1005 (VT/OG) provides voltage to each demand lamp. Each demand lamp
switch, when activated, provides ground to the selected lamp. The lamps are grounded through circuit 570 (BK/WH) or 57 (BK). The battery saver
deactivates the voltage circuit when the SJB has timed out.

Possible Causes

-

circuit 1005 short to voltage

-

SJB

Initial Inspection and Diagnostic Overview|Page 7293 > < Initial Inspection and Diagnostic Overview|Page 7291