Mariner 2WD V6-3.0L VIN 1 (2006)
J3-J4
Normal Operation
The stoplamp switch is supplied battery voltage through circuit 10 (LG/RD) from the smart junction box (SJB). When the brake pedal is applied, the
stoplamp switch allows voltage to flow through circuit 511 (LG). Circuit 511 (LG) sends voltage to the high mounted stoplamp and SJB, which in turn
provides voltage to the LH and RH rear lamps.
Possible Causes
-
Fuse
-
Circuit 10 (LG/RD) open
-
Circuit 511 (LG) open
-
Stoplamp switch
-
SJB
Test K: One Or More Stoplamps Are Inoperative
PINPOINT TEST K: ONE OR MORE STOPLAMPS ARE INOPERATIVE
K1-K2