mercury Workshop Repair Guides

Mercury Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 8627 > < Initial Inspection and Diagnostic Overview|Page 8625
Page 6
background image

B6-B8

Normal Operation

When any door, liftgate, or liftgate glass is opened, the ajar switch opens the circuit to the smart junction box (SJB). The SJB monitors the ajar
circuits, and based on the ajar status, the SJB will supply ground to the interior lamps on circuit 401 (PK).

Possible Causes

-

Circuit 401 (PK) short to ground

-

Circuit 570 (BK/WH) open

-

Circuit 700 (WH/PK) open or short to voltage

-

Circuit 701 (LB/BK) open or short to voltage

-

Circuit 760 (PK/LB) open or short to voltage

-

Circuit 867 (DB) open or short to voltage

-

Circuit 1312 (LG/BK) open or short to voltage

Initial Inspection and Diagnostic Overview|Page 8627 > < Initial Inspection and Diagnostic Overview|Page 8625