mercury Workshop Repair Guides

Mercury Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 8632 > < Initial Inspection and Diagnostic Overview|Page 8630
Page 11
background image

G1-G2

Normal Operation

The battery saver provides voltage to circuit 1005 (VT/OG). Circuit 1005 (VT/OG) provides voltage to each demand lamp. Each demand lamp
switch, when activated, provides ground to the selected lamp. The lamps are grounded through circuit 57 (BK). The battery saver function of the smart
junction box (SJB) deactivates the voltage circuit when the SJB has timed out.

Possible Causes

-

Circuit 1005 (VT/OG) short to voltage

-

SJB

Initial Inspection and Diagnostic Overview|Page 8632 > < Initial Inspection and Diagnostic Overview|Page 8630