mercury Workshop Repair Guides

Mercury Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 2844 > < Initial Inspection and Diagnostic Overview|Page 2842
Page 78
background image

Yes

GO to V2. 

No

REPAIR the DLC as necessary. CLEAR the DTCs. REPEAT the network test with the scan tool.

-------------------------------------------------
V2 CHECK THE MS-CAN TERMINATION RESISTANCE

-

Disconnect: Negative Battery Cable .

-

Measure the resistance between the DLC C251-3, circuit VDB06 (GY/OG), harness side and the DLC C251-11, circuit VDB07 (VT/OG), harness
side.

-

Is the resistance between 54 and 66 ohms?

Yes

GO to V3. 

No

GO to V5.

-------------------------------------------------
V3 CHECK THE MS-CAN (+) AND MS-CAN (-) CIRCUITS FOR A SHORT TO GROUND

-

Measure the resistance between the DLC C251-3, circuit VDB06 (GY/OG), harness side and ground; and between the DLC C251-11, circuit
VDB07 (VT/OG), harness side and ground.

-

Are the resistances greater than 1,000 ohms?

Yes

CONNECT the negative battery cable. GO to V4. 

No

GO to V19.

-------------------------------------------------
V4 CHECK THE MS-CAN (+) AND MS-CAN (-) CIRCUITS FOR A SHORT TO VOLTAGE

-

Ignition ON.

-

Measure the voltage between the DLC C251-3, circuit VDB06 (GY/OG), harness side and ground; and between the DLC C251-11, circuit VDB07
(VT/OG), harness side and ground.

Initial Inspection and Diagnostic Overview|Page 2844 > < Initial Inspection and Diagnostic Overview|Page 2842