Milan FWD L4-2.3L VIN Z (2007)
3.
Verify that the two (2) wings are not touching the floor pan tunnel (Figure 2). If they are, proceed to Step 4. If not, follow the normal service
diagnostic procedures, refer to WSM, Section 100-04.
4.
Pull the wings down vertically to achieve a minimum clearance of 3/4" (20 mm). (Figures 3 and 4)
WARRANTY STATUS: Eligible Under Provisions Of New Vehicle Limited Warranty Coverage And Emissions Warranty Coverage
IMPORTANT: Warranty coverage limits/policies are not altered by a TSB. Warranty coverage limits are determined by the identified causal part.
OPERATION
DESCRIPTION
TIME
071707A
2006-2007 Fusion/Milan,
0.2 Hr.
2006 Zephyr, 2007 MKZ
Vehicles Built On Or
Before 8/7/2007: Inspect
And Adjust Heat Shield