Milan FWD L4-2.3L VIN Z (2007)
Clock: Pinpoint Tests
PINPOINT TEST A: THE CLOCK OPERATION IS ERRATIC/INOPERATIVE
A1
A1-A2
Normal Operation
The clock receives battery voltage from the smart junction box (SJB) through circuit SBP07 (WH/RD). Ground for the clock is supplied through
circuit GD116 (BK/VT).
Possible Causes
-
Fuse
-
Circuit GD116 (BK/VT) open
-
Circuit SBP07 (WH/RD) open
-
Clock