mercury Workshop Repair Guides

Mercury Workshop Service and Repair Manuals

Relay Box > < Power Distribution Module|Service and Repair
Page 2
background image

-

To install, tighten to 5 Nm (44 lb-in).

4. Position the SJB aside, disconnect the RKE antenna electrical connector and remove the SJB.

5. NOTE:  If the PMI procedure was not followed when a new SJB was installed, the RKE function (from the integrated keyhead transmitter [IKT])

of the SJB must be programmed, or the IKT RKE functions will be inoperative. IKTs can be programmed to the new SJB by cycling each IKT key
to the ON position for a minimum of 6 seconds. If a new instrument cluster was installed, the IKT keys must be programmed to the new
instrument cluster.

To install, reverse the removal procedure.
-

Download the SJB configuration from the scan tool into the new SJB.

Relay Box > < Power Distribution Module|Service and Repair