mercury Workshop Repair Guides

Mercury Workshop Service and Repair Manuals

Throttle Position Sensor/Switch, A/T > < A/C - Heater Core Electrolysis/Leakage|Page 4547
Page 6
background image

6 speed transaxle

6. NOTE: When installing the selector lever cable, make sure that the selector lever cable locking tabs are locked in place and the cable end is

snapped onto the ball stud. Press the selector lever cable into the bracket and listen for the cable to click in place. Pull back on the selector lever
cable to make sure that it is locked into the bracket. Also make sure that the selector lever cable end is correctly installed onto the ball stud. Pull
back on the selector lever cable end to make sure that the cable end is correctly installed.

Install the selector lever cable in the bracket. Be sure the tabs are locked in place.

7. Connect the selector lever cable end on the manual lever.

8. Install the battery and battery tray.

All vehicles

9. Install the RCM.

10. Install the heater core and evaporator core housing.
11. Adjust the selector lever cable.

Throttle Position Sensor/Switch, A/T > < A/C - Heater Core Electrolysis/Leakage|Page 4547