mercury Workshop Repair Guides

Mercury Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 3257 > < Initial Inspection and Diagnostic Overview|Page 3255
Page 125
background image

Yes

CONNECT the negative battery cable. GO to AE42. 

No

REPAIR the circuit in question. CONNECT the negative battery cable. CLEAR the DTCs. REPEAT the network test with the scan tool.

-------------------------------------------------
AE10 CHECK THE HS-CAN CIRCUITS BETWEEN THE IPC (GASOLINE ENGINE) AND THE DLC FOR AN OPEN

 

-

Disconnect: Instrument Panel Cluster (IPC) C220 .

-

Measure the resistance between the IPC C220-25, circuit VDB04 (WH/BU), harness side and the DLC C251-3, circuit VDB06 (GY/OG), harness
side.

-

Measure the resistance between the IPC C220-26, circuit VDB05 (WH), harness side and the DLC C251-11, circuit VDB07 (VT/OG), harness
side.

-

Are the resistances less than 5 ohms?

Yes

CONNECT the negative battery cable. GO to AE50 

No

REPAIR the circuit in question. CONNECT the negative battery cable. CLEAR the DTCs. REPEAT the network test with the scan tool.

-------------------------------------------------
AE11 CHECK THE HS-CAN CIRCUITS BETWEEN THE BECM (HYBRID) AND THE DLC FOR AN OPEN

 

-

Disconnect: Battery Energy Control Module (BECM) C4237a .

-

Measure the resistance between the BECM C4237a-22, circuit VDB04 (WH/BU), harness side and the DLC C251-3, circuit VDB06 (GY/OG),
harness side.

Initial Inspection and Diagnostic Overview|Page 3257 > < Initial Inspection and Diagnostic Overview|Page 3255