mercury Workshop Repair Guides

Mercury Workshop Service and Repair Manuals

Valve Body, A/T|Removal and Installation|Page 6077 > < Valve Body, A/T|Removal and Installation|Page 6075
Page 4
background image

7. Connect the molded lead frame to the sensor.

-

Connect the bulkhead connector.

-

Connect the Electronic Pressure Control (EPC).

-

Connect the Torque Converter Clutch (TCC).

-

Connect the shift solenoid SSA/SS1 and SSB/SS2.

8. CAUTION:  If installing a new filter, and the grommet remains in the main control bore, carefully use a small screwdriver to remove the

grommet. Use care not to damage the main control bore.

NOTE:  If transmission is being serviced for a contamination-related failure, use a new filter and seal.

Replace fluid filter and seal as required.

9. Position the (B) pan magnet into the (A) transmission fluid pan.

10. NOTE:  The pan gasket is reusable, clean and inspect for damage; if not damaged, the gasket should be reused.

Valve Body, A/T|Removal and Installation|Page 6077 > < Valve Body, A/T|Removal and Installation|Page 6075