mercury Workshop Repair Guides

Mercury Workshop Service and Repair Manuals

Disassembly and Assembly|Page 5793 > < Disassembly and Assembly|Page 5791
Page 4
background image

4. Note:  Note the location of the eight coasting booster valve shuttle balls for assembly.

Remove the eight coasting booster valve shuttle balls.

5. Remove the converter drain back valve and solenoid pressure supply screen.

6. Remove the main control valve body cover plate.

1. Remove the 13 bolts.
2. Remove the valve body cover plate and gasket

Disassembly and Assembly|Page 5793 > < Disassembly and Assembly|Page 5791