Mountaineer 2WD V8-4.6L (2010)
-
Stage 6: Tighten an additional 60 degrees.
5. Connect the CMCV electrical connector.
6. Attach the wiring harness retainers to the intake manifold.
7. Connect the heated PCV fitting electrical connector.
8. Connect the PCV hose to the heated PCV fitting on the intake manifold.
9. Connect the TP sensor electrical connector.
10. Connect the EVAP hose to the intake manifold.
11. Connect the ETB electrical connector.
12. Install the fuel rail and injectors. For additional information, refer to Fuel Delivery and Air Induction.
13. Install the ACL outlet pipe. For additional information, refer to Fuel Delivery and Air Induction.