mercury Workshop Repair Guides

Mercury Workshop Service and Repair Manuals

Peanut Fitting|Page 9940 > < Peanut Fitting|Page 9938
Page 3
background image

Coupling Size

Pad Size

3/8 inch

25 x 50 mm (1 x 2 inch)

1/2 inch

25 x 50 mm (1 x 2 inch)

5/8 inch

25 x 76 mm (1 x 3 inch)

3/4 inch

25 x 102 mm (1 x 4 inch)

3. Assemble the pad to the tool.
4. Coat the abrasive pad with PAG compressor oil YN-12-C F7AZ-19589-DA or equivalent meeting Ford specification WSH-M1C231-B.
5. Roll the pad on the tool and install it in a variable speed drill motor.

6. Polish for one minute at moderate speed (less than 1,500 rpm) or until the surface is clean and free of scratches or foreign material.

CAUTION:  Maintain low speed drill rotation when inserting or removing the cleaning tool to prevent axial scratches which may cause future
leaks.

7. Clean the fitting with a lint-free cloth.
8. Inspect the surface for grooves or scratches. If grooves and scratches are still present, install a new component.

9. Clean the O-ring seal grooves with a 300 mm (12 inches) length of natural fiber string.

^

Loop the string around the grooves and pull the string back and forth.

10. Remove any foreign material from the grooves with a lint-free cloth.

CONNECT

Peanut Fitting|Page 9940 > < Peanut Fitting|Page 9938