Mountaineer AWD V8-4.6L SOHC VIN W (2002)
3. Use a wool applicator to apply adhesive meeting Ford specification WSB-M2G234-C to any exposed metal on the pinch weld. Allow six to ten
minutes to dry.
4. Apply (A) Foam dam meeting Ford specification WSB-M2G234-C to the (B) pinch weld.
5. If reinstalling original windshield, remove the excess urethane adhesive from the windshield glass.
6. Clean the inside of the glass surface with an alcohol-free cleaner making sure the ceramic coated area is clean.
7. NOTE: Wipe off the glass prep immediately after each application.
Apply glass prep meeting Ford specification WSB-M2G314-B twice around the glass surface to be urethaned.
8. Apply glass primer meeting Ford specification WSB-M5B280-C to the same area that was prepped in the previous step. Allow five minutes to
dry.
9. Cut the urethane applicator tip to specification.
10. CAUTION: If the vehicle is to be driven within 24 hours of urethane application, urethane adhesive Essex U-216 must be used due to its
one hour cure time.
Apply a bead of urethane adhesive meeting Ford specification WSB-M2G316-B to the pinch weld just outside the foam dam.