mercury Workshop Repair Guides

Mercury Workshop Service and Repair Manuals

Lamps and Indicators - Engine > < Intake Manifold|Lower|Page 2513
Page 4
background image

10. Install degas tube to the upper intake manifold. Tighten retaining nuts to 16-20 Nm (12- 14 ft. lbs.). 
11. Install the engine control sensor wiring bracket onto the throttle body retaining stud bolts.
12. Connect crankcase ventilation tube, aspirator vacuum supply hose and evaporative emission return tube to fittings underneath upper intake

manifold.

13. Install EGR valve to exhaust manifold tube to EGR valve. Tighten to 35-65 Nm (26-47 ft. lbs.). 
14. Connect vacuum hose to fuel pressure regulator.
15. Connect engine control sensor wiring connections to idle air control valve, throttle position sensor, EGR backpressure transducer and EGR

vacuum regulator solenoid.

16. Install accelerator cable bracket to side of throttle body. Tighten retaining bolts to 17 Nm (13 ft. lbs.). 
17. Connect accelerator cable and speed control actuator cable to throttle body lever. Install accelerator retracting spring.
18. Install accelerator cable shield. Tighten bolts to 1.4 Nm (13 inch. lbs.). 
19. Install air cleaner outlet tube.
20. Connect battery ground cable.
21. Fill engine cooling system.
22. Start engine and check for vacuum and exhaust leaks.
23. Check engine idle. Adjust as necessary.

NOTE: This adjustment must be performed if the throttle body is removed for any reason and if throttle plate idle adjustment screw position is
changed.

Lamps and Indicators - Engine > < Intake Manifold|Lower|Page 2513