Topaz FWD L4-140 2.3L CFI (1987)
Figure 14 - Article 87-10-12
Tighten the two (2) pan-to-transmission bolts, then loosen one-half turn. Tighten fourteen (14) oil pan flange-to-cylinder block bolts 6-9
ft.lbs. (8-12 N-m) following the sequence shown in Figure 14. Tighten the two (2) pan-totransmission bolts.
6.
Reinstall starter cable and exhaust bracket.
7.
Replace water inlet tube O-ring and install water tube and reposition air conditioner line.
8.
Install roll restrictor (MTX). Refer to Engine Installation.
9.
Lower vehicle.
10.
Install engine oil and coolant.