mercury Workshop Repair Guides

Mercury Workshop Service and Repair Manuals

Sensors and Switches - Computers and Control Systems > < Diagram Information and Instructions|Page 2813
Page 2
background image

1. Place PCM into its mounting position.
2. Install mounting bolts and nut.
3. Plug in PCM electrical connectors.
4. Position fuel pump relay and install bracket attaching nut.
5. Install ventilation duct.
6. Install trim panels on floor console under instrument panel.
7. Connect negative battery cable.

Sensors and Switches - Computers and Control Systems > < Diagram Information and Instructions|Page 2813