mini Workshop Repair Guides

Mini Workshop Service and Repair Manuals

Roof Rack Frame|Service and Repair|Page 2179 > < Roof Rack Frame|Service and Repair
Page 2
background image

IMPORTANT:  In order to achieve the required flow behaviour of the foam in the cavity, a cartridge temperature of approx. 65 °C to 70 °C is
required.

WARNING:  Danger of scalding.

Lay 2 cartridges in a heat-resistant container and weight down.
Filling container with approx. 3 litres boiling water.
Insert cartridges for approx. 30 minutes.

Carry over the work step shown symmetrically to the other side of the vehicle.
Screw drilling hole template 41 2 101 in area of front side windows into screw fastening points of roof trim strip (1). Positioning at second and third
screw fastening points from front.

IMPORTANT:

Roof Rack Frame|Service and Repair|Page 2179 > < Roof Rack Frame|Service and Repair