Cooper JCW (R56) L4-1.6L Turbo (N14) (2010)
Screw in bolt (1) with threaded insert (2) into all bores.
Continue inserting bolt (1) with threaded insert (2) until foam emerges (approx. 5 turns).
NOTE: Threaded insert (2) cannot be tightened down.
Structural foam (3) must emerge all round between collar (2) and roof outer skin.
IMPORTANT: Only structural foam which has emerged all round provides adequate corrosion protection.
Carry over the work step shown symmetrically to the other side of the vehicle.
Screw retaining strip 41 2 103 in area of front side windows into screw fastening points of roof trim strip (1).
Collar of threaded insert must be pressed uniformly onto roof outer skin.