Cooper JCW Convertible (R57) L4-1.6L Turbo (N14) (2010)
Insert special tool 00 2 271 on left and right in sleeve (1).
If necessary, turn special tool 00 2 271 until screw can be inserted and tighten down.
Unscrew nuts (2).
Tightening torque 51 11 3AZ.
Installation:
Remove special tool 00 2 271 only when front panel is completely installed.
Pull front panel (1) approx. 10 cm forwards and if necessary pay attention to further cable holders.
Insert special tool 00 2 272 on left and right.
Installation:
To ensure that front panel (1) is correctly seated, slide panel on left and right uniformly towards rear.
With a second person helping, slide front panel into position and secure.
When installing, pay attention to retaining tabs on headlight.