mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Battery Voltage Signal|Page 2707 > < Voltage Signal|Description and Operation
Page 1
background image

Voltage Signal: Testing and Inspection
Battery Voltage Signal

Back-up And Voltage Signal Circuit

To test the battery back-up and voltage signal, proceed as follows.

1. Using a volt meter, check the voltage between ECU harness terminal 60 and ground.

Voltage

System voltage.

2. Disconnect the negative battery cable and the ECU connector.
3. Using an ohm meter, check for continuity between the positive battery terminal and ECU harness terminal 60.

Continuity

Should exist.

4. Using an ohm meter, check for continuity (SHORTS) between chassis ground (not the negative battery terminal) and ECU harness terminal 60.

Continuity

Should not exist.

If any of the previous tests produce unsatisfactory results, the harness will need to be repaired or replaced. Once repairs have been completed,
confirm that the repair has corrected the problem. SEE CHASSIS ELECTRICAL DIAGRAMS.

If the trouble returns, it is possible that there is an intermittent failure of the component or the ECU. Check for looseness at all harness junctions and
test for an intermittent failure.

Battery Voltage Signal|Page 2707 > < Voltage Signal|Description and Operation