Eclipse L4-1997cc 2.0L DOHC Turbo 16 Valve (1996)
3. Push in the rod little by little with the vise until the set hole A in the rod is aligned with the hole B in the cylinder.
4. Insert a wire [1.4 mm (0.055 in.) in diameter] into the set holes.
5. Unclamp the auto tensioner from the vise.
6. Install the auto tensioner to the front case and tighten to the specified torque.
CAUTION: Leave the wire installed in the auto tensioner.
M TENSIONER PULLEY INSTALLATION
1. Install the tensioner pulley in such direction that its two small holes are arranged vertically.
P
TIMING BELT INSTALLATION