mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Evaporative Emission Purge Solenoid <--> [Canister Purge Solenoid] > < Canister Purge Control Valve|Description and Operation
Page 1
background image

Canister Purge Control Valve: Testing and Inspection

1. Remove the purge control valve.

2. Connect a hand vacuum pump to the vacuum nipple of the purge control valve.

3. Apply a vacuum of 53 kPa (16 in.Hg.) and check airtightness.
4. Blow in air lightly from the evaporative emission canister side nipple and check conditions as follows.

5. Connect a hand vacuum pump to the positive pressure nipple of the purge control valve.
6. Apply a vacuum of 53 kPa (16 in.Hg) and check airtightness.

Evaporative Emission Purge Solenoid <--> [Canister Purge Solenoid] > < Canister Purge Control Valve|Description and Operation