mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 2641 > < Initial Inspection and Diagnostic Overview|Page 2639
Page 354
background image

STEP 3. Measure at fog light (LH) connector A-28 in order to check the ground circuit to the fog light (LH).

1. Disconnect fog light (LH) connector A-28, and measure at the wiring harness side.

2. Measure the resistance value between terminal 2 and ground.

-

The measured value should be 2 ohm or less.

Q: Does the measured resistance value correspond with this range?

YES: Go to Step 6.

NO: Go to Step 4.

STEP 4. Check fog light (LH) connector A-28 for damage.

Q: Is fog light (LH) connector A-28 in good condition?

YES: Go to Step 5.

NO: Repair or replace the connector. Refer to Harness Connector Inspection. Check that the fog lights illuminate normally.

Initial Inspection and Diagnostic Overview|Page 2641 > < Initial Inspection and Diagnostic Overview|Page 2639