mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

High Pressure Safety Valve HVAC > < Mechanical Specifications|Page 4597
Page 3
background image

>>A<< HEATER CORE INSTALLATION

After replacing the heater core, check that the water shut valve is at "OPEN" position when refilling engine coolant.

>>B<< EVAPORATOR INSTALLATION

When replacing the evaporator, refill with a specified amount of compressor oil and install it.

Compressor oil: SUN PAG 56
Quantity: 60 cu.cm (2.0 floz)

High Pressure Safety Valve HVAC > < Mechanical Specifications|Page 4597