mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 2161 > < Initial Inspection and Diagnostic Overview|Page 2159
Page 97
background image

STEP 4. Check the wiring harness between power window main switch connector E-12 (terminals 1 and 5) and front power window motor
(LH) connector E-11 (terminals 1 and 2).

Q: Is the wiring harness between power window main switch connector E-12 (terminals 1 and 5) and front power window motor (LH) connector E-11
(terminals 1 and 2) in good condition?

YES: No action to be taken.

NO: Repair the wiring harness. When the power window main switch is operated, the front power window (LH) should open and close normally.

Inspection Procedure D-4

Power Window: Only Power Window (RH) Does Not Work By Operating Power Window Sub-switch.

Initial Inspection and Diagnostic Overview|Page 2161 > < Initial Inspection and Diagnostic Overview|Page 2159