mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 2174 > < Initial Inspection and Diagnostic Overview|Page 2172
Page 110
background image

NO: Repair or replace the connector. Refer to Harness Connector Inspection. When the power window sub-switch is operated, the power window
(RH) should open or close normally.

STEP 15. Check the wiring harness between power window sub-switch connector E-05 (terminals 4 and 6) and front power window motor
(RH) connector E-04 (terminals 2 and 1).

Q: Is the wiring harness between front power window main switch (RH) connector E-05 (terminals 4 and 6) and front power window motor (RH)
connector E-04 (terminals 2 and 1) in good condition?

YES: No action to be taken.

NO: Repair the wiring harness. When the power window sub-switch is operated, the power window (RH) should open or close normally.

Inspection Procedure D-5

Power Window: Door Window (RH) Does Not Work By Operating Power Window Main Switch.

Initial Inspection and Diagnostic Overview|Page 2174 > < Initial Inspection and Diagnostic Overview|Page 2172