Eclipse FWD L4-1997cc 2.0L DOHC MFI (1997)
2. Install torque converter control valve and torque converter clutch valve. Install dual retainer plate with Installer/Remover MB995016 or
equivalent.
3. Install check balls and retainers.
4. Install thermal valve.
5. Install separator plate from transfer plate. Install O/D clutch check ball and oil screen.
6. Install 2-4 accumulator retaining plate screws (2).