mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Shift Solenoid, A/T > < Pressure Regulating Solenoid, A/T|Specifications
Page 1
background image

Pressure Regulating Solenoid: Testing and Inspection

PRESSURE CONTROL SOLENOID VALVE (PCSV) CHECK 

1. Disconnect the PCSV connector.
2. Measure the resistance between the PCSV side connector terminal 1 and the body ground.

Standard value: Approximately 3 ohms let 20°C (68°F)] 

3. If the resistance is outside the standard value, replace the solenoid valve assembly.

Shift Solenoid, A/T > < Pressure Regulating Solenoid, A/T|Specifications