mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Engine Controls - Hard Hot Start/Rough Idle|Page 3075 > < Engine Controls - Hard Hot Start/Rough Idle|Page 3073
Page 3
background image

h.

At the Check Code screen, press the right arrow -->.

i.

The ECU part number and ROM ID will display. Note the part number and refer to the table in Attachment A of this bulletin to select the
appropriate ROM pack database number.

4.

Disconnect the MUT-II and turn the ignition key to OFF.

5.

Gather the reprogramming equipment shown.

IMPORTANT

Dealers must update ROM packs as needed, depending on vehicle repair requirements for PCM software updates.

For instructions on updating ROM packs using MEDIC, and for current database information:

1)

From the MEDIC Main Menu, select "MUT-II ROM Pack Re-write."

2)

Select "ROM Pack Information."

When updating the ROM packs for this bulletin, use the passwords shown.

6.

Install the red label interface cartridge to the MUT-II. Then install the 256 KBYTE red memory card and the red label ROM pack. Use the ROM
pack with the appropriate database number.

7.

Reconnect the MUT-II. Connect both the 16-pin and the 12-pin data link connectors.

8.

Turn the ignition key to ON.

CAUTION

DO NOT DISTURB THE HARNESS CABLES OR CONNECTIONS. INTERRUPTION DURING THE PROGRAMMING PROCESS COULD
CAUSE THE PCM TO LOSE DATA OR PREVENT FUTURE PCM REPROGRAMMING.

Engine Controls - Hard Hot Start/Rough Idle|Page 3075 > < Engine Controls - Hard Hot Start/Rough Idle|Page 3073