mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 2272 > < Initial Inspection and Diagnostic Overview|Page 2270
Page 213
background image

YES: Go to Step 11.

NO: Repair or replace it. Refer to Harness Connector Inspection. The door lock switch input signal should be able to be checked and the central door
locking system should work normally.

STEP 11. Check the harness wires between power window sub switch connector E-05 and ground.

NOTE:  After checking intermediate connector C-95, check the wires. If intermediate connector C-95 is damaged, repair or replace it. Refer to Harness
Connector Inspection.

Q: Are the harness wires between power window sub switch connector E-05 and ground in good condition?

YES: There is no action to be taken.

NO: Repair them. The door lock switch input signal should be able to be checked and the central door locking system should work normally.

STEP 12. Check the power window sub switch connector E-05 and ETACS-ECU connector C-112 for damage.

Q:

Initial Inspection and Diagnostic Overview|Page 2272 > < Initial Inspection and Diagnostic Overview|Page 2270