mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Engine - Revised Nut & Bolt Tightening Specifications|Page 1440 > < Engine - Revised Nut & Bolt Tightening Specifications|Page 1438
Page 8
background image

Tightening Sequences for Elastic Main Bearing Bolts

Installation of Connecting Rod Nut

Before installing the connecting rod nuts, check the connecting rod bolts for elongation as described in the steps below. Also, when installing connecting
rod nuts, lightly coat the threads of each nut with clean engine oil.

Connecting Rod Bolt Check

1.

Coat the threads of the connecting rod nut with clean engine oil.

2.

By hand, run each connecting rod nut down the thread of its respective bolt.

3.

If the connecting rod nut cannot run the length of the bolt threads without binding, replace the connecting rod bolt.

4.

Repeat Steps 1-3 for the rest of the connecting rod nuts.

5.

The 420A (2.0L) engine used on the 1995-96 Eclipse uses bolts only, not nuts and bolts. To check the connecting rod bolts on the 420A engine,
lay a straight edge against the bolt threads. If the threads are not even and level against the straight edge, replace the bolt. Refer to the illustration.

NOTE:  

Connecting rod nuts and bolts are tightened alternately in steps, first one side and then the other. Refer to the chart for torque specifications.

Connecting Rod Nut Tightening Torque for 1992-96 MMSA Vehicles

Engine - Revised Nut & Bolt Tightening Specifications|Page 1440 > < Engine - Revised Nut & Bolt Tightening Specifications|Page 1438