Galant L4-2.0L SOHC (1989)
Multiport Fuel Injection Relay
Fig. 1 Control Relay Test
COMPONENT TEST
1. Remove the control relay.
2. Using an ohm meter, check the resistance between the terminals as shown in FIG. 1.
Multiport Fuel Injection Relay
Fig. 1 Control Relay Test
COMPONENT TEST
1. Remove the control relay.
2. Using an ohm meter, check the resistance between the terminals as shown in FIG. 1.