Lancer L4-2.4L (4B12) (2009)
Pre-removal & Post-installation Operation
Master Cylinder Removal Steps 1-9, Brake Booster Removal Steps 1-18
[VACUUM HOSE AND VACUUM PIPE]
Pre-removal & Post-installation Operation
Master Cylinder Removal Steps 1-9, Brake Booster Removal Steps 1-18
[VACUUM HOSE AND VACUUM PIPE]