mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Engine Controls - MIL ON/DTC's P0300/P0301-P0304 Set|Page 16 > < Engine Controls - MIL ON/DTC's P0300/P0301-P0304 Set|Page 14
Page 4
background image

a. From the MUT-III Main Page confirm your MUT-III version is Ver 24.0.

^

If the version displayed on your MUT-III Main Page is lower than version 24, locate the MUT-III Scan Tool Viewer CD (ver 24.0) and follow the
instructions on the CD label to update your MUT-III.

Reprogramming Procedure

REPROGRAMMING PROCEDURE

CONNECT A BATTERY CHARGER TO THE VEHICLE'S BATTERY DURING THE REPROGRAMMING PROCEDURE, DO NOT ALLOW
THE BATTERY CHARGER TO TIME OUT. BATTERY VOLTAGE (AS MEASURED AT THE BATTERY POST WITHOUT ELECTRICAL
LOAD) MUST BE KEPT AT 12.4V OR HIGHER IN ORDER TO REPROGRAM THE ECM. MEASURE THE BATTERY VOLTAGE AND
CHARGE AS NECESSARY.

NOTE

VCI Stand-alone reprogramming is not available for this procedure. The laptop and the VCI must remain connected for the entire procedure.

Connect the equipment as follows:

^ Turn the laptop computer on. If you're running on battery power and the charge indicator in the lower right hand corner of the screen does not show a

full charge it is recommended that either the laptop battery be charged prior to beginning or that reprogramming be completed with the A/C power
adaptor connected to the laptop.

^ Connect the USB cable to the VCI.

^ When the laptop displays the MUT-III main screen connect the USB cable to the laptop.

^ Connect the MUT-III main harness with the blue DLC connection to the VCI.

^ Connect the blue connector of the MUT-III main harness to the vehicles data link connector.

^ Turn the VCI power switch ON. Verify that the indicator lamp in the upper right corner of the screen is green.

Engine Controls - MIL ON/DTC's P0300/P0301-P0304 Set|Page 16 > < Engine Controls - MIL ON/DTC's P0300/P0301-P0304 Set|Page 14