mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 2572 > < Initial Inspection and Diagnostic Overview|Page 2570
Page 113
background image

3. Measure the voltage between terminal 10 and ground.

-

The voltage should be approximately 12 volts (battery positive voltage).

Q: Is the measured voltage approximately 12 volts (battery positive voltage)?

YES: Go to Step 12. 

NO: Go to Step 11.

Initial Inspection and Diagnostic Overview|Page 2572 > < Initial Inspection and Diagnostic Overview|Page 2570