mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Initial Inspection and Diagnostic Overview|Page 2601 > < Initial Inspection and Diagnostic Overview|Page 2599
Page 142
background image

2. Measure the resistance value between terminal 5 and ground.

-

The resistance should measure 2 ohms or less.

Q: Is the measured resistance 2 ohms or less?

YES: Go to Step 29. 

NO: Go to Step 28.

Initial Inspection and Diagnostic Overview|Page 2601 > < Initial Inspection and Diagnostic Overview|Page 2599