mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Thermostat, Engine Cooling|Specifications|Page 1558 > < Thermostat, Engine Cooling|Specifications
Page 1
background image

Thermostat: Service and Repair

REMOVAL 

Pre-removal Operation:
-

Engine Coolant Draining.

INSTALLATION

Installation in reverse order as removal.

Installation Service Point 

>A< Thermostat Installation.  

Install the thermostat so that the jiggle valve is facing straight up.

CAUTION:  Make absolutely sure that no oil is adheres to the rubber ring of the thermostat. Also, be careful not to fold over or scratch the rubber
ring when inserting.

Post-installation Operation:
-

Engine Coolant Supplying.

INSPECTION 

-

Check that valve closes tightly at room temperature.

-

Check for defects or damage.

-

Check for rust or encrustation on the valve, and remove if necessary.

Thermostat, Engine Cooling|Specifications|Page 1558 > < Thermostat, Engine Cooling|Specifications