Montero 4WD V6-3.5L SOHC (1998)
>D< Side Plate Installation (8)
Line up the dowel pin hole of the side plate with the dowel pin of the pump body when installing the side plate.
>E< Rotor Installation (6)
Install the rotor to the pulley assembly so that the rotor's punch mark is at the pump cover side.
>F< Snap Ring Installation (5)
After installation of the snap ring, lift the rotor and check that the snap ring has entered the countersunk part.
>G< Cam Ring Installation (4)
Install the cam ring with the punch mark facing the side plate.
>H< Vane Installation (3)
Install the vanes on the rotor, paying close attention to the installation direction.
INSPECTION
-
Check the flow control valve for clogging.
-
Check the pulley assembly for wear or damage.
-
Check the rotor and vane groove for "stepped" wear.