Montero LS 4WD V6-2972cc 3.0L SOHC 24 Valve (1996)
STEP 3. Measure the park/neutral position switch terminal input voltage.
-
Engine control module connector: Connected
-
Park/neutral position switch connector: Disconnected
-
Ignition switch: ON
Voltage (V): Battery positive voltage
OK: STOP
NG: Replace the engine control module.
SOHC 24 Valve Engine
IGNITION SWITCH-ST AND PARK/NEUTRAL POSITION SWITCH
OPERATION