mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

EVAP Emission Purge Solenoid (No.1) Check|Page 3356 > < EVAP Emission Purge Solenoid (No.1) Check|Page 3354
Page 1
background image

EVAP Emission Purge Solenoid: Testing and Inspection
EVAP Emission Purge Solenoid (No.2) Check

EVAPORATIVE EMISSION PURGE SOLENOID (NO.2) CHECK

NOTE:
When disconnecting the vacuum hose, make an identification mark on it so that it can be reconnected to the original position.
1. Disconnect the vacuum hose from the solenoid valve.
2. Disconnect the harness connectors.
3. Connect a hand vacuum pump to the nipple to which the red-striped vacuum hose was connected.
4. Apply a vacuum and check for air-tightness when voltage applied directly to the evaporative emission purge solenoid (No.2) and when the

voltage is discontinued.

5. Measure the resistance between the terminals of the solenoid valve.

Standard value: 36 - 44 ohms [at 20°C (68°F)]

EVAP Emission Purge Solenoid (No.1) Check|Page 3356 > < EVAP Emission Purge Solenoid (No.1) Check|Page 3354