mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Diassembly, Inspection and Reassembly|Page 5326 > < Diassembly, Inspection and Reassembly
Page 2
background image

d. Remove rack piston from mainshaft by turning it counterclockwise. Use care not to lose 26 balls inside rack piston. Remove locknut using

spanner wrench tool No. MB991367, or equivalent, and guide mainshaft out while pressing bearing race so balls do not drop out, then remove
valve housing oil seal and bearing using a suitable bearing removal tool.

2. Reverse numbered sequence shown in Fig. 31 to assemble power steering gear, noting the following:

a. Apply grease to bearing surface of side cover needle bearing and install the 33 rollers.
b. Apply grease to bottom of side cover, then position new O-ring on the cover.
c. Install adjusting bolt and plate into slot on top of cross shaft. Install plate with chamfered side toward cross shaft mating surface.
d. Adjust cross shaft endplay to 0-0.002 inch, using spacers as necessary.
e. Install side cover onto cross shaft, tighten with adjusting bolt, then tighten locknut temporarily.
f.

Apply thin coat of grease to gear housing U-packing and oil seal, then press them into housing using tool Nos. MB990938 and MB990926, or
equivalents.

g. Apply thin coat of grease to lip of valve housing oil seal, then press it into housing.
h. Press ball bearing into top cover, then install thrust plate, needle roller bearing and second thrust plate into cover. Install the thinner of the

two thrust plates on top cover side.

i.

Install, then temporarily tighten top cover.

j.

Using tool No. MB990853, or equivalent, and a spring scale,  torque top cover to 14-19 lbs., then loosen cover completely. Rotate input worm
shaft and check for smooth operation.

k. Measure starting torque using tool No. MB990228, or equivalent, while turning input worm shaft and note the value.
l.

Tighten top cover until starting torque of input worm shaft is 1.8-2.7 inch lbs., more than value measured in preceding step.

m. Install valve housing nut, then torque to 131-166 ft. lbs.
n. Measure starting torque again while turning input worm shaft. Preload should measure 2-6 inch lbs. If not, loosen valve housing nut and repeat

steps for establishing correct preload.

o. Secure gear housing in a vise, then install screw unit.
p. Install valve housing attaching bolts, then torque to 33-39 ft. lbs. Rotate input worm shaft to move rack piston to the Neutral position.
q. Install cross shaft with side cover to gear housing. Torque attaching bolts to 33-39 ft. lbs. When installing cross shaft assembly, apply a thin

coat of Dexron II or Diamond ATF SP to rack piston teeth and shaft and multi-purpose grease to lip of oil seal. Do not rotate side cover
when installing
. Wrap cross shaft serration of with vinyl tape, then install it carefully to avoid damaging seal.

3. Measure total starting torque of input worm shaft, in the Neutral position, and adjust to 4-8 inch lbs. Ensure screw unit operates smoothly

throughout its entire range.

4. Connect cross shaft to pitman arm. Ensure slit on tip of shaft is aligned with mark on pitman arm and tighten to specifications.

Diassembly, Inspection and Reassembly|Page 5326 > < Diassembly, Inspection and Reassembly