mitsubishi Workshop Repair Guides

Mitsubishi Workshop Service and Repair Manuals

Band, A/T > < Shift Solenoid, A/T|Specifications|Page 3345
Page 4
background image

If harness connector C-92 is in good condition, go to Step 5.

STEP 5. Check The Harness Wires Between PCM Connector C-92 And Solenoid Valve Connector B-02. 

NOTE:  After inspecting intermediate connector C-96, inspect the wire. If intermediate connector C-96 is damaged, repair or replace it.

If any harness wire between PCM connector C-92 and solenoid valve connector B-02 is damaged, repair them. Recheck for DTCs.
If the harness wires are in good condition, recheck for DTCs.
If the malfunction is not eliminated, replace the PCM.

Band, A/T > < Shift Solenoid, A/T|Specifications|Page 3345