Montero Sport XLS 4WD V6-3.5L SOHC (2002)
2. Remove part of the DOJ boot from the DOJ outer race to release the air pressure inside the boot.
CAUTION: Be sure that the installation direction of the boot bands is correct.
3. Secure the boot band (large) on DOJ boot.
BJ BOOT (RESIN BOOT) REPLACEMENT
1. Remove the boot bands (large and small).
NOTE: The BJ boot bands cannot be re-used.
2. Remove the BJ boot.
3. Turn the adjusting bolt on special tool MB991561 so that the size of the opening (W) is at the standard value.
NOTE: The value of W will change by approximately 0.7 mm (0.03 inch) for each turn of the adjusting bolt.
NOTE: The adjusting bolt should not be turned more than once.
Standard value (W): 2.9 mm (0.12 inch)
If it is larger then 2.9 mm (0.12 inch)>
Tighten the adjusting bolt.
If it is smaller then 2.9 mm (0.12 inch)>
Loosen the adjusting bolt.