Montero SR 4WD V6-3.5L SOHC (1997)
Shift Solenoid: Testing and Inspection
Shift Solenoid No. 2
INSPECTION
1. Disconnect the shift solenoid connector.
2. Measure the resistance between terminal No. 7 and the ground.
Standard value: 13 +/- 2 ohms [at 25° C (77° F)]
3. If the resistance is outside the standard value, replace the solenoid assembly.