Montero XLS 4WD V6-3.5L SOHC (2001)
STEP 8. Check the sunroof motor assembly connector F-02 for damage.
Q: Is sunroof motor assembly connector F-02 in good condition?
YES: Go to Step 9.
NO: Repair or replace it. Refer to Harness Connector Inspection. The sunroof should work normally.
STEP 9. Check the harness wires between sunroof motor assembly connector F-02 and ignition switch (IG2).
NOTE: After checking intermediate connectors F-24 and D-26, joint connector D-01 and junction block connectors D-210 and D-208, check the wires.
If intermediate connectors F-24 and D- 26, joint connector D-01 and junction block connectors D-210 and D-208 are damaged, repair or replace them.
Refer to Harness Connector Inspection.
Q: Are the harness wires between sunroof motor assembly connector F-02 and ignition switch (IG2) in good condition?
YES: There is no action to be taken.
NO: Repair or replace them. The sunroof should work normally.
STEP 10. Check the sunroof motor assembly ground circuit at the sunroof motor assembly connector F-02.
1. Disconnect the sunroof motor assembly connector F-02 and measure at the harness side.